Secure your position in our latest batch of Antminer S21 Hydro miners.
$96,960
Updates every 10 minutes
72 out of 96 miners available for this batch
Closing Date: May 1st, 2025
96 Units
Total batch capacity
July 2025
Estimated Start of Operations
State-of-the-art Bitcoin mining hardware with advanced liquid cooling
Maximum Hash Rate
Power Consumption
Power Efficiency
PSU Efficiency
Input Voltage
Operating Temperature
Operating Humidity
Weight
Dimensions: 410 x 170 x 209 mm | Cooling: Advanced Hydro-cooling System
* PSU included with all miners | Full manufacturer warranty included
Live calculations based on current network conditions
* Calculations update every 10 minutes based on current Bitcoin price and network difficulty.
* Actual results may vary due to Bitcoin price volatility and network changes.
Join our latest mining batch with industry-leading efficiency and performance
Latest Generation Bitcoin Miner
per unit
* Mining rewards are estimated based on current network difficulty and Bitcoin price. Actual results may vary.
© 2025 Iron Vault Mining | All prices are subject to change based on availability
Clear breakdown of costs associated with your S21 Hydro operation
Projected mining revenue based on different Bitcoin price and network difficulty scenarios
* These projections are estimates only. Actual results will vary based on market conditions, network changes, and Bitcoin price movements.