Investment Plans

Secure your position in our latest batch of Antminer S21 Hydro miners.

Bitcoin Price

+2.85% (24h)

$96,960

Updates every 10 minutes

Miner Availability

72 units remaining

72 out of 96 miners available for this batch

Investment Closes In

Urgent
00
Days
00
Hours
00
Minutes
00
Seconds

Closing Date: May 1st, 2025

Batch Size

96 Units

Total batch capacity

Batch Launch Date

July 2025

Estimated Start of Operations

Antminer S21 Hydro

State-of-the-art Bitcoin mining hardware with advanced liquid cooling

395 TH/s

Maximum Hash Rate

5925W

Power Consumption

15.0 J/T

Power Efficiency

95%+

PSU Efficiency

380-415V

Input Voltage

0-40°C

Operating Temperature

10-90%

Operating Humidity

15.4 kg

Weight

Dimensions: 410 x 170 x 209 mm | Cooling: Advanced Hydro-cooling System

* PSU included with all miners | Full manufacturer warranty included

Real-Time Mining Profitability

Live calculations based on current network conditions

Daily

BTC Mined 0.00020
Revenue $19.5
Electricity -$11.4
Net Profit $8.2

Monthly

BTC Mined 0.00604
Revenue $586.1
Electricity -$341.3
Net Profit $244.8

Yearly

BTC Mined 0.07355
Revenue $7,131.1
Electricity -$4,152.2
Net Profit $2,978.8

Current Parameters

BTC Price: $96,960
Network Difficulty: 1.23e+14
Electricity Rate: 8 cents/kWh
Pool Fee: 0.0%

* Calculations update every 10 minutes based on current Bitcoin price and network difficulty.

* Actual results may vary due to Bitcoin price volatility and network changes.

Current Batch: Antminer S21 Hydro

Join our latest mining batch with industry-leading efficiency and performance

Current Batch

Antminer S21 Hydro

Latest Generation Bitcoin Miner

$6,640.00

per unit

Miner Specifications

Hash Rate
395 TH/s
Power Consumption
5925W
Efficiency
15.0 J/T
Cooling
Hydro
  • Professional Installation & Setup
  • 24/7 Monitoring & Management
  • Real-time Performance Dashboard
  • Competitive Electricity Rate ($0.08/kWh)
  • Priority Technical Support
Batch Details
  • • Launch Date: July 2025
  • • Location: North American Facility
  • • Minimum Order: 1 Unit
  • • Volume Discounts Available

* Mining rewards are estimated based on current network difficulty and Bitcoin price. Actual results may vary.

© 2025 Iron Vault Mining | All prices are subject to change based on availability

Operating Costs & Structure

Clear breakdown of costs associated with your S21 Hydro operation

Operating Costs

  • Electricity Rate 8 cents/kWh
  • Daily Power Cost ~$11.4/day
  • Pool Fee 0.0%
  • Maintenance & Support Included

What's Included

  • Professional Installation & Configuration
  • 24/7 Facility Management & Security
  • Hydro-cooling System Maintenance
  • Real-time Performance Monitoring
Important Notes
  • • Power costs are calculated based on the S21 Hydro's 5925W consumption
  • • All maintenance and operational costs are handled by our team
  • • Direct custody of mined Bitcoin - paid out daily to your wallet
  • • No hidden fees or additional charges

Mining Performance Scenarios

Projected mining revenue based on different Bitcoin price and network difficulty scenarios

Conservative

  • BTC Price Current
  • Network Difficulty +20% Growth
  • Monthly Revenue Based on Calculator

Moderate

  • BTC Price +25% Growth
  • Network Difficulty +15% Growth
  • Monthly Revenue +25% vs Conservative

Optimistic

  • BTC Price +50% Growth
  • Network Difficulty +10% Growth
  • Monthly Revenue +50% vs Conservative
Key Assumptions
  • • Calculations based on S21 Hydro's 395 TH/s hashrate
  • • Electricity cost fixed at $0.08/kWh
  • • Network difficulty adjusted monthly based on scenario
  • • Bitcoin price variations impact revenue directly

* These projections are estimates only. Actual results will vary based on market conditions, network changes, and Bitcoin price movements.

Need More Information?

We're here to help you make an informed decision